Hi All,
Long time lurker here, first time posting. Have some questions on a project I have ongoing right now and what to prioritize as the season starts to change. It has started to dawn on me that the amount of work I would like to get done and the amount of time I have available before winter are not going to line up.
A few details;
Location - Northern Ohio/Zone 6B
Size - Approximately 280’ x 90’ x 10’ deep. Approximate volume of 185,000 gallons.
Elongated kidney bean shape.
Nearly solid clay base - ground water runoff to fill (engineered grading plan and soil tests/test holes were completed prior to digging)
2.7hp variable speed bottom intake pump to feed approximately 20,000GPH over a waterfall along with an aerator feeding dual head bubblers.
Rough estimate for pond to fill is late spring 2027.
Pond has a 6’ shallow shelf around the perimeter with depth ranging from 2” to 8”. I have roughly 200 tons of sandstone that I need to manually set once the excavation process is fully wrapped.
I have (2) roughly 6’ wide x 40’ long bioswales cut in at the 2 main intake points.
Questions/Advice Needed -
Should i prioritize getting the sandstone set in the shallows this fall? Before the pond fills and i either have to pump it down or work in 6” of water? OR should i fully flesh out the bioswales by getting the stone in place and all the filter plants planted?
With winter approaching, I’m not sure the filter plants will do much through the cold, but having them in place for the start of spring may help filter some of the sediment as it gradually fills up.
The sandstone is for the most part ornamental, but it may never be easier to set than when the pond is empty.
Would it be smart to try to filter the water progressively as the pond fills? Or let it fill and then try to address the entire body of water at once?
Any other factors I should be considering?
I appreciate any guidance this sub can provide!